Power System & Short Circuit Analysis in PLTGU PLN UPDK Keramasan Using ETAP

  • Karin Alisya Politeknik Negeri Sriwijaya
  • Destra Andika Pratama Politeknik Negeri Sriwijaya
  • Masayu Anisah Politeknik Negeri Sriwijaya
Keywords: load flow

Abstract

This study aims to analyse the power flow and short circuit faults in the Gas and Steam Power Plant (PLTGU) of PT PLN Keramasan using ETAP software. Power flow analysis is carried out to determine the distribution of voltage, current, and power in the PLTGU electrical system and to ensure the efficiency and stability of system operations. The results of the power flow simulation show that the PT PLN Keramasan PLTGU can generate and distribute power with a stable voltage under various load conditions. In addition, short-circuit fault analysis aims to identify potential impacts. The short-circuit fault analysis finds important areas that are vulnerable to faults and require special protection. ETAP allows simulating various fault scenarios and establishing effective protection systems to reduce damage. This study emphasises the use of ETAP software as a powerful analytical tool in the planning and operation of the PLTGU electrical system. Power flow and short circuit analysis with ETAP is proven to improve the reliability, efficiency and safety of PT PLN Keramasan's PLTGU operations.

References

A. G. Nigara and Y. Primadiyono, “Analisis Aliran Daya Sistem Tenaga Listrik pada Bagian Texturizing di PT Asia Pasific Fibers Tbk Kendal menggunakan Software ETAP Power Station 4.0,” J. Tek. Elektro, vol. 7, no. 1, pp. 7–10, 2015.

T. D. Umi Rasyda, “Power System Analysis of Steam Power Plant Using ETAP at ULPL Indralaya South Sumatra,” J. Teknol. Inf. dan Pendidik., vol. 16, no. 2, pp. 1–20, 2023, doi: 10.24036/jtip.v16i2.785.

P. Studi Teknik Elektromedik et al., “Saklar Otomatis Berbasis Mikrokontroler Untuk Mengurangi Penggunaan Energi Listrik I Made Agus Mahardiananta 1 , I Made Aditya Nugraha 2* , Putu Aries Ridhana Arimbawa 3 , Dewa Ngakan Gde Tisna Prayoga 4 134,” vol. 4, no. 1, pp. 59–66, 2021, [Online]. Available: https://s.id/jurnalresistor

M. Anwar and Z. Zulwisli, “Pengujian Kinerja Pembangkit Listrik Tenaga Surya Untuk Menggerakkan Pompa Air,” J. Teknol. Inf. dan Pendidik., vol. 10, no. 3, pp. 44–47, 2018, doi: 10.24036/tip.v10i3.16.

A. Hasibuan, M. Isa, M. I. Yusoff, and S. R. A. Rahim, “Analisa Aliran Daya Pada Sistem Tenaga Listrik Dengan Metode Fast Decoupled Menggunakan Software Etap,” RELE (Rekayasa Elektr. dan Energi) J. Tek. Elektro, vol. 3, no. 1, pp. 37–45, 2020, doi: 10.30596/rele.v3i1.5236.

N. Randa, M. Liga, D. Mangopo, E. M. Ohee, and M. A. Reza, “Analisis Kontingensi Sistem Transmisi Kelistrikan Jayapura Menggunakan Etap 19.0.1,” J. Teletronik, vol. 1, no. 2, pp. 14–23, 2023.

A. Yaqin, “Studi Aliran Daya Sistem Distribusi Radial Tiga Fasa Metode Newton-Raphson Untuk Memperbaiki Profil Tegangan Menggunakan Rekonfigurasi Jaringan Dan Penempatan Kapasitor Bank,” p. 143, 2015.

R. Y. Irsyadullah, “Analisa Gangguan Hubung Singkat Sistem Tenaga Listrik Di Pusat Penampung Produksi Menggung Pertamina Asset Iv Field Cepu Dengan Menggunakan Metode Etap 12.6,” 2018.

Hariyadi, “ISSN 2599-2081 EISSN 2599-2090 Fak . Teknik UMSB Rang Teknik Journal,” Vol. I No.1 Januari 2018, vol. I, no. 1, pp. 43–51, 2018, [Online]. Available: https://jurnal.umsb.ac.id/index.php/RANGTEKNIKJO URNAL/article/view/598

R. Kurniawan and M. Hazwi, “Analisa Performansi Pembangkit Listrik Tenaga Gas Uap (Pltgu) Sicanang Belawan,” J. e-Dinamis, vol. 10, no. 2, pp. 1–7, 2014, [Online]. Available: http://download.garuda.kemdikbud.go.id/article.php?article=1432825&val=4135&title=Analisa Performansi Pembangkit Listrik Tenaga Gas Uap Pltgu Sicanang Belawan

F. T. Sipil, K. Institut, and T. Sepuluh, “Jurnal Darma Agung Kajian Life Cycle Assessment Dan Life Cycle Cost Pada Corresponding Author : Pembangkit Listrik Tenaga Gas Uap ( PLTGU ) merupakan suatu instalasi peralatan,” pp. 242–246, 2024.

N. Gusnita and K. S. Said, “Analisa Efisiensi dan Pemanfaatan Gas Buang Turbin Gas Alsthom Pada Pembangkit Listrik Tenaga Gas Kapasitas 20 Mw,” vol. 14, no. 2, pp. 209–218, 2017.

S. Sumardi and P. Julianto, “Analisa Aliran Daya Pada Jaringan Distribusi 20 KV PT. PLN (Persero) Sebatik Menggunakan Software ETAP Powerstation 12.6.0,” Elektr. Borneo, vol. 4, no. 1, pp. 19–23, 2018, doi: 10.35334/jeb.v4i1.1299.

I. Pondaag et al., “Studi Aliran Beban Sistem 150 KV Wilayah Sulawesi Utara - Gorontalo,” vol. 9, no. 3, pp. 145–154, 2020.

Emmy Hosea and Yusak Tanoto, “Perbandingan Analisa Aliran Daya dengan Menggunakan Metode Algoritma Genetika dan Metode Newton-Raphson,” J. Tek. Elektro, vol. 4, no. 2, pp. 63–69, 2004, [Online]. Available: http://puslit2.petra.ac.id/ejournal/index.php/elk/article/view/16190

Seraceddin Levend Zorluoğlu, “No Title طرق تدريس اللغة العربية,” Экономика Региона, p. 32, 2012.

C. Kumolo, “Analisis Aliran Beban pada Sistem Tenaga Listrik di KSO Pertamina EP – GEO Cepu Indonesia Distrik 1 Kawengan menggunakan Software ETAP 12.6,” Emit. J. Tek. Elektro, vol. 16, no. 1, pp. 1–15, 2016, doi: 10.23917/emitor.v16i1.2677.

M. Fikri, D. Anggaini, S. Tinggi, T. Pln, and M. A. Id, “Metode Newton Raphson Untuk Analisis Aliran Daya Jaringan Distribusi 12,66 kV,” J. Ilm. SUTET, vol. 8, no. 2, pp. 114–121, 2018.

A. D. Ernia, “Analisa Gangguan Hubung Singkat Pada Sistem Tenaga Listrik Di Pertamina Ep - Central Processing Plant Area Gundih Menggunakan Software ETAP 12.6,” Univ. Muhammadiyah Surakarta, 2017, [Online]. Available: http://eprints.ums.ac.id/49284/4/NASKAH PUBLIKASI ANA.pdf

B. Badaruddin, “Analisa Gangguan Hubung Singkat Dengan Menggunakan Etap 12.6.0 Pada Pt X,” J. Tek., vol. 5, no. 1, 2017, doi: 10.31000/jt.v5i1.338.

L. M. Hayusman, T. Hidayat, C. Saleh, I. M. Wartana, and T. Herbasuki, “Pelatihan Software ETAP (Electrical Transient Analyzer Program) Bagi Siswa dan Guru SMK Nasionl Malang,” Ind. Inov. J. Tek. Ind., vol. 7, no. 1, pp. 7–11, 2017, [Online]. Available: https://ejournal.itn.ac.id/index.php/industri/article/view/856

R. Samsinar and W. Wiyono, “Studi Keandalan Rekonfigurasi Jaringan Program Zero Down Time (Zdt) di Kawasan Sudirman Central Business Distric (Scbd) Menggunakan Software ETAP 12.6,” Resist. (elektRonika kEndali Telekomun. tenaga List. kOmputeR), vol. 2, no. 1, p. 65, 2019, doi: 10.24853/resistor.2.1.65-72.

Published
2025-03-26
How to Cite
[1]
K. Alisya, D. Pratama, and M. Anisah, “Power System & Short Circuit Analysis in PLTGU PLN UPDK Keramasan Using ETAP”, JTIP, vol. 18, no. 1, pp. 697-710, Mar. 2025.
Abstract viewed = 11 times
PDF downloaded = 6 times