Power System Analysis of Steam Power Plant Using ETAP at ULPL Indralaya South Sumatra

  • Thriska Dewi Umi Rasyda Universitas Negeri Malang
  • Arif Nur Afandi Universitas Negeri Malang
  • Yuni Rahmawati Universitas Negeri Malang
Keywords: Power Flow, Short Circuit, Coordinating Relay, ETAP 19.0.1

Abstract

PT PLN (Persero) UPDK Keramasan have three   group work units in South Sumatra Province which is study has located in Ogan Ilir Regency namely PT. PLN ULPL Indralaya. This study is one steam turbine generator unit often experiences shutdown due to several factors. One of them is out of service for the protection operating system on the 4 MVA to 11.5/6.9 kV transformer unit when there is a disturbance so that there is an inter-trip to the upstream system which results in a blackout system.  We analyzed the disturbance using ETAP software. We made three analyzes there are load flow, short circuit and relay coordination. As study results submitted to PT PLN ULPL Indralaya is to scenario 3 for the analysis of the resulting lower flow is a decrease in load of about 63% for short circuit value obtained between 0.011 to 50.776 kA also relay coordination should be adding devices such as IDMT curve Long Time Inverse.

Author Biography

Thriska Dewi Umi Rasyda, Universitas Negeri Malang

Universitas Negeri Malang

References

Ery Fuji Risnawati and Nurissaidah Ulinnuha, “Optimasi Pembagian Beban Pada Turbin Gas Blok 1 dan Blok 3 PLTGU PT. PJB UP Gresik Menggunakan Metode Iterasi Lambda Berdasarkan Base Point and Participation Factors,” Publikasi Ilmiah Matematika, vol. 5, no. 2, pp. 83–94, 2020, doi: org/10.29080/algebra.v1i2.10.

Xue Zhang, Dong Sheng Wang, Fuchun Jiang, Tao Lin, and Hao Xiang, “An Optimal Regulation Method for Parallel Water-Intake Pump Group of Drinking Water Treatment Process,” IEEE Access, vol. 8, pp. 82797–82803, 2020, doi: 10.1109/ACCESS.2020.2991895.

Haleonar Mycson Karusitio Silaban and Abdul Ghofur, “Analisa Performa Turbin Gas Tipe CW251 B11 pada Sistem Pembangkit Listrik Tenaga Gas Sektor Pembangkitan Bali,” JTAM Rotary, vol. 2, no. 2, pp. 161–170, 2020, doi: org/10.20527/jtam_rotary.v2i2.2412.

E. K. Arakelyan, A. V. Andryushin, G. A. Pikina, S. V. Mezin, and A. A. Kosoy, “The choice of the optimal energy-saving technology redundant power steam turbines during the passage of the daily schedules of power consumption gaps,” in Procedia Computer Science, Elsevier B.V., 2019, pp. 69–74. doi: 10.1016/j.procs.2019.08.013.

Manish Parihar and M.K Bhaskar, “Review of Power System Blackout, International Journal of Research and Innovation in Applied Science (IJRIAS),” 2018. doi: org/10.51584/IJRIAS.

J. William D. Stevenson, Analisis Sistem Tenaga Listrik. Jakarta: Erlangga, 1996.

Caesar Wiratama, “Cara Kerja Turbin Uap.” [Online]. Available: https://www.aeroengineering.co.id/ 2021/05//cara-kerja-turbin-uap/

“Studi Analisis Sistem Tenaga Listrik.” [Online]. Available: https://www.omazaki.co.id/studi-analisis-sistem-tenaga-listrik/

“Pengertian Software.” [Online]. Available: https://www.sekawanmedia.co.id/blog/pengertian-software

Dewa Putra Iwana, “Memahami Software: Data & Instruksi Terprogram Dalam Komputer.” [Online]. Available: https://www.sekawanmedia.co.id/blog/pengertian-software

Muhammad Fauzan Gusti Triyanto, “Sekilas Tentang Software ETAP Berserta Tollbarnya.” [Online]. Available: https://www.anakteknik.co.id/fauzan_triyanto02/articles/sekilas-tentang-software-etap-beserta-tollbarnya

Heru Dibyo Laksono and Aditya Putra Pratama, “Perancangan dan Analisa Sistem Kendali Frekuensi Sistem Tenaga Listrik dengan Metode Penempatan Kutub,” Teknologi Informasi & Pendidikan, vol. 10, no. 2, pp. 37–48, 2017, doi: org/10.24036/tip.v10i2.30.

Fivia Eliza and Dwiprima Elvanny Myori, “Trainer Pada Pembelajaran Dasar Dan Pengukuran Listrik,” Teknologi Informasi & Pendidikan, vol. 10, no. 1, pp. 12–22, 2017, doi: org/10.24036/tip.v10i1.40.

Muhammad Anwar and Zulwisli, “Pengujian Kinerja Pembangkit Listrik Tenaga Surya Untuk Menggerakkan Pompa Air,” Teknologi Informasi & Pendidikan, vol. 10, no. 3, pp. 44–47, 2017, doi: org/10.24036/tip.v10i3.16.

Miftahul Fikri and Dwi Anggaini., “Metode Newton Raphson Untuk Analisis Aliran Daya Jaringan Distribusi 12,66 kV,” Ilmiah Sutet, vol. 8, no. 2, pp. 114–121, 2018, [Online]. Available: https://jurnal.itpln.ac.id/sutet/article/view/226

Agusthiaus S.Sampeallo, Nursalim, and Patrisius J. Fischer, “Analisa Jaringan Hubung Singkat Pada Pemakaian Sendiri PLTU Bolok PT. SMSE (IPP) Unit 3 dan dan 4 Menggunakan Software ETAP 12.6.0,” Jurnal Media Elektro, vol. VIII, no. 1, pp. 76–85, doi: org/10.35508/jme.v8i1.1442.

Yulisman, “Analisis Arus Gangguan Hubung Singkat Sistem Tenaga Listrik Dengan Aplikasi Matlab,” Jurnal Rang Teknik, vol. 1, no. 1, pp. 113–121, 2018, doi: org/10.31869/rtj.v1i1.598.

Rahman Dashti, Salahedin Hassani, and Hamid Reza Shaker, 2018 5th International Conference on Electrical and Electronics Engineering (ICEEE 2018) : May 3-5, 2018, Istanbul, Turkey. 2018. doi: org/10.1109/ICEEE2.2018.8391343.

Amine Zeggai Irecom and Farid Benhamida, Proceedings of Algerian Large Electrical Network Conference : CAGRE’2019 : Algiers, Algeria, 26-28 February 2019. 2019. doi: org/10.1109/CAGRE.2019.8713172.

Sugiyano, Metode Penelitian Kuantitatif Kualitatif dan R&D. Bandung: Alfabeta, 2021.

Published
2023-10-28
How to Cite
[1]
T. D. Umi Rasyda, A. Afandi, and Y. Rahmawati, “Power System Analysis of Steam Power Plant Using ETAP at ULPL Indralaya South Sumatra”, JTIP, vol. 16, no. 2, pp. 1-20, Oct. 2023.
Abstract viewed = 135 times
PDF downloaded = 45 times